Mintia-Brad-Stei natural gas transport pipeline, stage I, Mintia section Realization of the natural gas transport pipeline Mintia-Brad-Stei, stage I section Mintia – Brad DN300 35 km PROJECT LOCATION: Mintia – Brad – Stei – Jud. Hunedoara Client: The National Natural Gas Transport Society "TRANSGAZ" S.A. Period: 2019 - 2020 Date: June 21, 2023 Category: Projects Related projects Projects 28″ & 20″ Undercrossing of Danube river and Borcea branch with horizontal directional drilling (HDD) Projects Relining cu Primus Line DN250 conducta titei DN300 12 km Parc 10 Balaria – Depozit 4 Anghelesti Projects Natural gas transport pipeline DN500 36,020 km – Reconsideration Craiova – Segarcea pipeline route Projects VESTMOLDTRANSGAZ – Interconnection pipeline of the natural gas transport system